Track Work
March 26, 2016
- Ethan Doty




/gallery/Track_Work/DSC_0228.jpg
David Elems and Bil Jackson unbolting the stand from throw rod.

/gallery/Track_Work/Track_Work_160326.jpg
Track Work March 26, 2016

/gallery/Track_Work/DSC_0251.jpg
Bil and David unbolting the throw rod from the switch points.

/gallery/Track_Work/DSC_0259.jpg
Bil and David bolt the new throw rod onto the switch stand in it

/gallery/Track_Work/DSC_0265.jpg
David and Ethan Doty finish spiking the switch stand.

/gallery/Track_Work/DSC_0275.jpg
David and Greg Elems adjusting the distance between the points to make it perfect.

/gallery/Track_Work/IMG_20160326_134202686.jpg
David using the air tamper to tamp the ties at the 2/3 switch.

/gallery/Track_Work/IMG_20160326_144003727_HDR.jpg
Greg tamps while Steven Parry and Bil hold the tie up at the 3/4 switch with David ready to add more ballast if needed.