Track Work
March 26, 2016

- Ethan Doty


Page last updated:  Fri Oct 2 01:58:21 PM PDT 2026

Slide 1 David Elems and Bil Jackson unbolting the stand from throw rod.

Slide 2 Track Work March 26, 2016

Slide 3 Bil and David unbolting the throw rod from the switch points.

Slide 4 Bil and David bolt the new throw rod onto the switch stand in it

Slide 5 David and Ethan Doty finish spiking the switch stand.

Slide 6 David and Greg Elems adjusting the distance between the points to make it perfect.

Slide 7 David using the air tamper to tamp the ties at the 2/3 switch.

Slide 8 Greg tamps while Steven Parry and Bil hold the tie up at the 3/4 switch with David ready to add more ballast if needed.